Zum Inhalt springen

Sustainable and accessible, thanks to BKW Smart Building

A clubhouse with a future

A building that combines openness and sustainability: together with BKW Building Solutions, the accessible operations building to the Minergie-A standard became reality.

26

m³

of water from natural springs fit into the underground fresh water tank.

71

kW

of output come from the solar power system on the roof and the bike shelter.

26

tonnes of CO₂

had already been saved by the end of 2024.

The Swiss Bike Park has a strong appeal in the Bern region and a national reach well beyond its surroundings. As a flagship project, the park creates a meeting place for young and old, for pros and hobby riders alike.

Michael SteffenBKW Building Solutions

A clubhouse with a future

Building the Swiss Bike Park and its operations building is one of the foundation’s centrepieces, and it carries its values right down to the last detail. Just as the trails are open to everyone, the building is barrier-free and accessible to all. And because sustainability is no buzzword for the foundation, it was built to the Minergie-A standard and achieves a positive energy balance: a 75 kW solar power system on the roof and bike shelters supplies solar electricity, an underground fresh water tank holds 27 cubic metres of water from natural springs, and a modern heat pump both heats and cools. A building like this doesn’t come about alone: it was realised hand in hand with BKW, whose Building Solutions brought together four companies that delivered everything from a single source. It was precisely this collaboration that turned an ambitious vision into a building that sets new standards.

Together with

Presenting Partner